The Tristar Group has opened two new facilities aimed at enhancing its integrated logistics services to the downstream petroleum industry in the GCC. The new truck staging and workshop facility at ICAD 2 or Industrial City in Abu Dhabi 2 has 50,000 square meters of area offering tailor-made logistics service options to customers for transport, warehousing, storage and distribution services. The Oman facility is located in the Rusayl Industrial Estate Phase 2. It has a total plot of 15,000 square meters with a 2-storey office building and a 5-bay workshop with two inspection pits and a washdown bay. It can store products outside and inside the warehouse.